The Ottawa Hospital

Bassi Construction was hired as the General Contractor to complete The Ottawa Hospital, General Campus’ Parking Garage Restoration Project in 2016. The scope of work included expansion joint replacement, new control joint sealant and concrete breakthrough repairs. Through coordination with The Ottawa Hospital, Colliers Project Leaders, and Concentric Engineering, the project was completed with minimal disturbances to the residence and visitors of The General Hospital.


Previous post: