131 – 141 Cooper Street
Full fit-up of the ground floor of 218 units apartment building, conversion of 10 hotel rooms to apartments and the construction of 3 new apartments. Scope of work included basement, ground floor and mezzanine renovations; hallway finishes upgrades; suites kitchen, flooring and painting upgrades; elevator cab upgrades; lighting upgrade; electrical metering upgrade; boiler and hot water tank upgrade; generator repairs; localized garage membrane and concrete repairs; window sill repairs.